A numerical duplicate of the physical model allows to extend the geometrical simulations to optimally dimension the future dam.
A numerical duplicate of the physical model allows to extend the geometrical simulations to optimally dimension the future dam. Alain Herzog /2021 EPFL - A team of EPFL engineers has completed proof-of-concept tests for the new Massongex-Bex-Rhône hydropower dam. The tests, involving both a physical scale model and computer simulations, enabled the engineers to fine-tune their design. Engineers at EPFL's Platform of Hydraulic Constructions (PL-LCH) in Lausanne have just finished testing the design for the new Massongex-Bex-Rhône (MBR) hydropower dam. The tests began in November 2020 and were carried out on a scale model. They were used to calculate the design's energy efficiency and make sure the dam will not impact the surrounding natural ecosystem, while reaching its hydroelectric potential. PL-LCH was commissioned in the fall of 2020 by the company overseeing the MBR project.
TO READ THIS ARTICLE, CREATE YOUR ACCOUNT
And extend your reading, free of charge and with no commitment.
Your Benefits
- Access to all content
- Receive newsmails for news and jobs
- Post ads